CONSTRUCTION AREAS
Contract 1 AWTF- Advanced Wastewater Treatment Facility (AWTF)
AWTF Contract 1 began in January 2022. The contractor completing this work is Posillico-Bove. The subsurface recharge area has been completed and the AWTF is anticipated to be completed by the end of 2024.
Below is a picture of how AWTF will look once it's built.
Contract 2 LPS North - Installation of Low Pressure Sewers (LPS) in the Streets
Contract 2 - Low Pressure Sewers North began in January 2022 and the Contractor is Posillico-Bove. The Contractor will perform the following work activities in this order:
-
Stakeout existing utilities (water, gas, electric, etc) within the project areas using various forms of field markers, including but not limited to wooden stakes, PK nails, ribbon, flags, and paint.
-
Once the utilities are marked, test pits will be excavated in the street to verify the locations of existing utilities.
-
Excavation of the street and installation of the new sewer main.
-
Excavation to install the new sewer lateral from the new sewer main to the property line of each residence.
-
Restoration of the disturbed areas.
-
Repaving of the streets.
The map on the right provides anticipated staging of the work. Residents will be provided with 72-hour minimum advance notice with door hangers when work is to be initiated in their area. An example of the door hanger in English and Spanish is provided below.
Contract 3 LPS East - Installation of Low Pressure Sewers (LPS) in the Streets
Contract 3 - Low Pressure Sewers East began in January 2022 and the Contractor is Peter Scalamandre & Sons. The Contractor will perform the following work activities in this order:
-
Stakeout existing utilities (water, gas, electric, etc) within the project areas using various forms of field markers, including but not limited to wooden stakes, PK nails, ribbon, flags, and paint.
-
Once the utilities are marked, test pits will be excavated in the street to verify the locations of existing utilities.
-
Excavation of the street and installation of the new sewer main.
-
Excavation to install the new sewer lateral from the new sewer main to the property line of each residence.
-
Restoration of the disturbed areas.
-
Repaving of the streets.
The map on the right provides anticipated staging of the work. Residents will be provided with 72-hour minimum advance notice with door hangers when work is to be initiated in their area. An example of the door hanger in English and Spanish is provided below.
Contract 4 LPS South - Installation of Low Pressure Sewers (LPS) in the Streets
Contract 4 - Low Pressure Sewers North began in December 2022 and the Contractor is Posillico-Bove. The Contractor will perform the following work activities in this order:
-
Stakeout existing utilities (water, gas, electric, etc) within the project areas using various forms of field markers, including but not limited to wooden stakes, PK nails, ribbon, flags, and paint.
-
Once the utilities are marked, test pits will be excavated in the street to verify the locations of existing utilities.
-
Excavation of the street and installation of the new sewer main.
-
Excavation to install the new sewer lateral from the new sewer main to the property line of each residence.
-
Restoration of the disturbed areas.
-
Repaving of the streets.
The map on the right provides anticipated staging of the work. Residents will be provided with 72-hour minimum advance notice with door hangers when work is to be initiated in their area. An example of the door hanger in English and Spanish is provided below.